期刊文献+

浮式平台一体化海洋监测系统方案集成 被引量:2

Research and Development of Integrated Marine Monitoring System for Floating Platform
下载PDF
导出
摘要 以我国南海深水油气田的某半潜式生产储油平台为研究对象,基于其实际安全运维需求和监测预警技术的发展,设计一种集环境、姿态、结构、系泊、立管和压载等系统于一体的集成化海洋监测系统总体方案,包括系统的组成与架构、监测设备的要求与选型、数据采集与处理、软件开发与集成等主要环节。与传统的监测系统相比,该系统充分考虑目标平台的功能特点和使用环境特性,新增智能化姿态预报功能,用于指导现场作业。研究成果可助力我国深水资源开发安全运维技术装备的国产化发展。 An integrated marine monitoring system(IMMS) is designed for a deep-water semisubmersible production and storage platform in the South China Sea according to the requirements of safe operation and the development of monitoring technologies. The design incorporates environment monitoring, platform position, hull structure, mooring system, riser system, and ballast system in one scheme, which includes the composition and architecture of the system, the requirements and specifications of hardware, data collection and processing, and software development and integration. Considering the unique functional features and local environment, a novel intelligent platform position forecast module is also developed and incorporated in the system to provide onsite operational advice. The research will benefit domestic manufacturing of the safe operation and maintenance equipment of platform for deep-water resource exploration.
作者 武永锋 何骁勇 陈勇军 WU Yongfeng;HE Xiaoyong;CHEN Yongjun(CNOOC Hainan Branch,Haikou 570125,China;CNOOC Research Institute,Beijing 100028,China;DMAR Engineering,Inc.,Beijing 100085,China)
出处 《船舶与海洋工程》 2023年第1期71-75,共5页 Naval Architecture and Ocean Engineering
基金 工信部高技术船舶科研项目(MC-202030-H04)。
关键词 浮式平台 海洋监测系统 智能化预报 floating platform marine monitoring system intelligent forecast
  • 相关文献

参考文献3

二级参考文献12

  • 1聂炳林.国内外水下检测与监测技术的新进展[J].中国海洋平台,2005,20(6):43-45. 被引量:18
  • 2Halkyard J,Liagre P,Tahar A.Full scale data comparison for the Horn Mountain Spar[C]//ASME.2004.
  • 3Prislin I,Halkyard J,DeBord F,et al.Full-scale measurements of the Oryx Neptune production spar platform performance [ C ]//Proceedings of the Offshore Technology Conference.1999.
  • 4Van Dijk R,Van den Boom H.Full scale monitoring marco polo tension leg platform[ C ]//Proceeding of 26th OMAE.2007:29409.
  • 5Brown M G.Floating production mooring integrity JIP-key findings [ C ]//Proceedings of the Offshore Technology Conference.2005.
  • 6Machado R Z,Mourelle M M,Franciss R,et al.Monitoring program for the first steel catenary riser installed in a moored floating platform in deep water[ C ]//Proceedings of Oceans.1999.
  • 7Binet E,Tuset P,Mj3en S.Monitoring of offshore pipes [ C ]//Proceedings of the Offshore Technology Conference.2003:OTC-15163-MS.
  • 8Natarajan S,Howells H,Deka D,et al.Optimization of sensor placementto capture riser VIV response[C]//Proceedings of the 25th International Conference on Offshore Mechanics and Arctic Engineering.Hamburg:[ s.n.].2006.
  • 9Thethi R,Howells H,Natarajan S,et al.A fatigue monitorin strategy & implementation on a deepwater top tensioned riser [ C ]//Proceedings of the Offshore Technology Conference.Houston:[ s.n.].2005:OTC17248.
  • 10HU ZhiQiang,YANG JianMin,ZHAO YingNian,BAI Gang.Full scale measurement for FPSO on motions in six-degrees of freedom and environmental loads and deduction of mooring system loads[J].Science China(Physics,Mechanics & Astronomy),2011,54(1):26-34. 被引量:14

共引文献16

同被引文献12

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部