张家峁煤矿进入煤层群联合开采阶段,上、下工作面层间距较小。受2个工作面采动共同影响,覆岩应力及位移变化规律区别于单一煤层开采。通过理论建模、数值模拟及现场实测等方法,分析了上煤层采动影响底板应力分布及位移变形规律,论证了上工作面过下工作面切眼时液压支架支护阻力未异常增大,上工作面推进经过下工作面切眼整个过程中,间隔岩层发生弹性形变,下工作面顶板离层出现短暂的愈合期。
Zhangjiamao coal mine has entered the coal seam group joint mining stage,and the distance between the upper and lower working faces is relatively small.Affected by the mining of two working faces,the variation law of overburden stress and displacement is different from that of single coal seam mining.Through theoretical modeling,numerical simulation and field measurement,the stress distribution and displacement deformation law of the floor affected by the mining of the upper coal seam are analyzed.During the whole process of the upper working face advancing through the lower working face incision,the interval rock strata undergoes elastic deformation,and the roof separation layer of the lower working face has a short healing period.
作者
高彬
惠博
李军
毛小娃
尹建辉
GAO Bin;HUI Bo;LI Jun;MAO Xiaowa;YIN Jianhui(Shanmei Group Shenmu Zhangjiamao Mining Industry Co.,Ltd.,Shenmu 719316,China;Shaanxi Coal and Chemical Industry Technology Research Institute Co.,Ltd.,Xi'an 710100,China;The National Joint Engineering Research Center of the Green,Safe and Efficient Coal Mining,Xi'an 710100,China)
出处
《煤炭技术》
CAS
北大核心
2023年第1期59-63,共5页
Coal Technology
关键词
煤层群
联合开采
底板应力
采动影响
数值模拟
coal seam group
joint mining
bottom plate stress
mining impact
numerical simulation