浅析大跨度单元式GRG吊顶提升安装技术在山地施工中的研究应用

Research and Application of Long-Span Unit-Type GRG Ceiling Lifting Installation Technology inMountain Construction
下载PDF
导出
摘要 随着我国建筑行业的蓬勃发展,吊挂作为工程建设中必不可少的重要设施,其主要作用是将上部结构物与下部基础进行连接.提升施工过程中对吊塔起升高度及安装质量控制尤为关键.本文结合大跨度单元式桥梁整体布置特点和实际工况要求提出了适用于此施工范围内GRG吊顶施工技术方案以及实施措施,以期提高该工程吊顶安装施工的适用性和可靠性,并为类似工程提供参考借鉴意义. With the vigorous development of China’s construction industry,hanger is an indispensable important facility in engineering construction,its main role is to connect the superstructure with the lower foundation.The lifting height and installation quality control of the hoisting tower during the hoisting construction process is particularly critical.Based on the overall layout characteristics of long-span unit-type bridges and the actual working conditions,this paper puts forward the technical scheme and implementation measures applicable to the GRG ceiling construction within this construction scope,so as to improve the applicability and reliability of the ceiling installation construction of the project,and provide reference significance for similar projects.
作者 杨耀钧 Yang Yao-jun(Beijing Uni-Construction Group Co.,Ltd.Engineering General Contracting Department II,Beijing 102199,China)
出处 《建筑与装饰》 2023年第4期135-137,共3页 Construction & Decoration
关键词 大跨度单元式 GRG吊顶 山地工程 long-span unit-type GRG ceiling mountain engineering
  • 相关文献

参考文献4

二级参考文献20

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部