泡沫轻质土路基施工技术 被引量:3

Construction Technology of Foam Light Soil Subgrade
下载PDF
导出
摘要 对于陡坡路堤或桥头、涵台背难以压实的填方路堤段,采用泡沫轻质土路基的施工工艺作为施工质量的技术保证。基础采用C25混凝土浇筑;上下相邻浇筑层变形缝交错布置;浇筑至设计高程后,及时养护。执行泡沫轻质土路基标准工艺流程,验证了施工技术的可行性,节省工期的同时确保发泡剂性能检验基础要求、泡沫轻质土技术指标、密度实时控制允许误差均满足泡沫轻质土路基验收标准,在满足设计要求的同时提高了特殊路基的施工技术标准。 For the fill embankment section with steep slope embankment or bridge head and culvert abutment back which is difficult to compact, the construction technology of foam light soil subgrade is adopted as the technical guarantee of construction quality. C25 concrete is used for foundations. Deformation joints of adjacent layers are staggered. Maintenance shall be carried out in time after pouring to the design elevation. Standard process flow of foam light soil subgrade is carried out, which verifies the feasibility of construction technology. The construction period is saved while ensuring that the basic requirements of performance inspection of foaming agent, technical index of foamed light soil and allowable error of density real-time control all meet the acceptance criteria of foamed light soil subgrade, and the construction technology criteria of special subgrade are improved while meeting the design requirements.
作者 顾兴宇 谢斌 赵龙 唐润民 GU Xing-yu;XIE Bin;ZHAO Long;TANG Run-min(POWERCHINA SINOHYDRO ENGINEERING BUREAU 14 CO.,LTD.,Kunming 650041,China)
出处 《云南水力发电》 2023年第2期32-35,共4页 Yunnan Water Power
关键词 难以压实 填方路堤 泡沫轻质土路基 基础施工 变形缝设置 养护 hard to compact filled embankment foam light soil subgrade foundation construction deformation joint setting curing
  • 相关文献

参考文献2

二级参考文献4

共引文献3

同被引文献10

引证文献3

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部