摘要
深基坑的处理和建设是工程中最为重要的部分,在实际工程建设中需结合工程性质和当地水文地质情况,编制相应的专项施工方案。以重庆某工程为例,从工程的重难点分析、具体施工技术方案布置、质量、进度和安全保证措施等方面进行了探讨。实践证明,该专项施工方案能有效保障基础施工质量,达到相关设计规范要求。
The treatment and construction of deep foundation pit is the most important part of the project.In the actual project construction,the corresponding special construction scheme shall be prepared in combination with the project nature and local hydrogeological conditions.Taking a project in Chongqing as an example,this paper discusses the key and difficult points of the project,specific construction technology scheme layout,quality,progress and safety assurance measures.The practice proves that the special construction scheme can effectively guarantee the quality of foundation construction and meet the requirements of relevant design specifications.
作者
谷家传
GU Jiachuan(Investment Promotion Service Center of Chongqing Dazu Hi-tech Industrial Development Zone,Chongqing 400000)
出处
《现代工程科技》
2022年第9期93-96,共4页
Modern Engineering Technology
关键词
深基坑
支撑模板
场地清理
垫层
deep foundation pit
supporting formwork
site clearance
cushion