摘要
随着我国城市化速度的加快,人口流入一线城市及新一线城市的趋势逐步增强,超大城市对城市轨道交通提出了更高的要求。城市轨道交通全自动运行线路凭借其设备系统更好的可靠性、可维护性、可用性、能提高全周转时间内的运行效率及应急处置水平、提升城市轨道交通系统的自动化水平的同时降低劳动强度及节能减员等优势,逐步得到社会认可。从全自动运行线路综合联调技术的特点及运营筹备要点、综合联调过程中常见问题等组织管理要素方面进行了分析探讨。
With the acceleration of the trend of globalized cities,the trend of populationflowing into thefirst tier cities and newfirst tier cities has gradually increased,and the formed mega cities have put forward higher requirements for urban rail transit.The fully automatic operation line of urban rail transit is gradually recognized by many cities by virtue of its equipment system's better reliability,maintainability and availability,which can improve the operation efficiency within the full turnaround time,improve the emergency response level,improve the automation level of urban rail transit system,reduce the labor intensity and save energy and reduce personnel.This paper will analyze and discuss the technical characteristics of integrated joint commissioning of fully automatic operation lines,the key points of construction and operation preparation,and the common problems in the process of integrated joint commissioning.
作者
张超
ZHANG Chao(Urban Railway Company of CREC Electrification Bureau,Beijing 100000)
出处
《现代工程科技》
2022年第6期117-120,共4页
Modern Engineering Technology
关键词
城市轨道交通
全自动运行
综合联调
组织管理
urban rail transit
fully automatic operation
integrated joint commissioning
organization management