期刊文献+

西藏光伏项目可行性研究阶段光伏阵区桩基础形式比选研究 被引量:1

Comparison and Selection of the Pile Foundation Structure for the Array Area of Xizang Photovoltaic Project in Feasibility Study Stage
下载PDF
导出
摘要 在光伏项目可行性研究阶段,科学确定光伏阵区的桩基础形式,是保证项目建设安全、质量,并提高工程建设经济性的重要环节。根据项目建设特点,本文通过半定量和定量两个阶段,对光伏阵区各类可选桩基础形式进行了全面对比和分析,推荐采用螺旋钢管桩基础,全面替代目前西藏光伏项目的阵区基础全部使用的钢筋混凝土灌注桩,既可保证桩基工程质量,又能节约投资与缩短工期。 In the feasibility study stage of photovoltaic projects,selection of the pile foundation structure for the array area is an important procedure to ensure the construction safety and quality and improve the construction economy.Considering the specific characteristics of the project,various optional pile foundation forms of the array area are analyzed and compared comprehensively with semi-quantitative and quantitative methods.The spiral steel pipe pile foundation is recommended to completely replace the reinforced concrete cast-in-place piles used in array areas of current photovoltaic projects in Xizang,which can not only ensure the quality of the pile foundation work,but also save investment and shorten the construction time.
作者 蒋理 黄际钢 JIANG Li;HUANG Jigang(Huadian Xizang Energy Co.,Ltd.,Chengdu 610091,China;DG Hydropower Branch,Huadian Xizang Energy Co.,Ltd.,Shannan 856200,China)
出处 《水电与新能源》 2022年第12期20-22,41,共4页 Hydropower and New Energy
关键词 光伏项目 可行性研究 桩基础 螺旋钢管桩 photovoltaic project feasibility study pile foundation spiral steel pipe pile
  • 相关文献

参考文献7

二级参考文献32

共引文献110

同被引文献7

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部