通过对伊金霍洛旗东南部煤炭矿区产量、运输需求、既有铁路运输能力及铁路产权进行分析,确定了建设东台铁路(东胜东—台阁庙)的必要性。结合东台铁路线网布设、技术标准、接轨及引入点等因素,采用比较法从技术特点、工程投资、运营管理、对规划的影响等方面进行优缺点综合比较,最终确定了新建贯通正线方案为东台铁路引入海勒斯壕地区的最终方案,同时论证了铁路工程建设不能一味追求节省投资、线路短直,还需考虑地区规划、运营情况、建设条件及可持续发展等因素。
Upon the analysis of the yield,transport needs,transport capacity,and existing railway property rights of the coal mining area in southeastern Yijinhuoluo Qi,the construction necessity of Dongshengdong-Taigemiao Railway was determined.In this study,factors such as the layout of the Dongshengdong-Taigemiao Railway network,technical standards,and alignment and entry points were taken into account.Comprehensive comparisons of advantages and disadvantages were made from the aspects of technical characteristics,project investment,operation management,and the impact on planning.As a result,the new plan for connecting the main line was identified as the final plan to introduce Dongshengdong-Taigemiao Railway into the Hailesihao area.Meanwhile,it was proved that railway construction cannot only pursue investment reduction and lines of short distance;instead,it should also consider such factors as regional planning,operation,construction conditions,and sustainable development.
作者
黄磊
HUANG Lei(Railway Design Branch,Inner Mongolia Railway Survey and Design Institute Co.,Ltd.,Hohhot 010050,Inner Mongolia,China)
出处
《铁道货运》
2023年第2期11-19,共9页
Railway Freight Transport
关键词
东台铁路
条件分析
比较法
新建贯通正线方案
引入海勒斯壕地区方案
Dongshengdong-Taigemiao Railway
Conditional Analysis
Comparison Method
New Plan for Connecting the Main Line
Plan to Introduce Dongshengdong-Taigemiao Railway into Hailesihao Area