摘要
阐述二次设备的安装过程,变电站电气二次设备安装中的问题,质量控制技术,包括设备的接地、设备的选型、设计方案的质量、构件的质量、安装工艺的选择和应用。
This paper describes the installation process of secondary equipment, the problems in the installation of electrical secondary equipment in substations, and the quality control technology, including the grounding of equipment, the selection of equipment, the quality of design schemes, the quality of components, and the selection and application of installation technology.
作者
张猛
朱时锋
ZHANG Meng;ZHU Shifeng(Jiangsu Power Transmission and Transformation Co.,Ltd.,Jiangsu 210028,China)
出处
《电子技术(上海)》
2022年第12期296-297,共2页
Electronic Technology
关键词
二次设备
质量控制
安装工艺
secondary equipment
quality control
installation process