摘要 针对我司建造的某船整体式尾管安装后轴承斜度超差问题,通过对比分析不同支点状态下整体式尾管的轴承斜度变化,提出采用三点支撑法用于整体式尾管的安装,可较大幅度的调整整体式尾管轴承的斜度,保证了整体式尾管安装后轴承斜度满足要求。 Aiming at the problem of overlapping the bearing slope of the rear bearing of a velocity tube built by our company,through comparative analysis of the bearing slope of the overall pipe under different fulcrum states,it is proposed that the three-point support method is used for the overall pipe tube Installation,the slope of the overall tube bearing can be greatly adjusted,which ensures that the overall pipe tube is installed and the bearing slope meets the requirements.
作者 黄秋云 宫小康 周学志 陈婷婷 HUANG Qiuyun;GONG Xiaokang;ZHOU Xuezhi;CHEN Tingting(CSSC Huangpu wenchong Shipbuilding Co.,Ltd.,GuangZhou 511462)
出处 《广东造船》 2023年第1期46-48,共3页 Guangdong shipbuilding
关键词 整体式尾管 轴承斜度 三点支撑 Overall stern tube Slope of bearing Three-point support
  • 相关文献

参考文献2

二级参考文献8

  • 1CB/T4000-2005,中国造船质量标准.
  • 2中国船级社.材料与焊接规范(2006)[M].北京:人民交通出版社,2006.
  • 3中国船舶工业总公司指导性技术文件.CB/Z233-87艉管轴承压装计算与质量要求[S].2009.
  • 4徐芝纶.弹性力学简明教程[M].第三版.北京:高等教育出版社,2010.
  • 5CB/Z388-2005,船舶推进轴系校中[S].
  • 6American Bureau of Shipping. Guidance notes on propul- sion shafting alignment [ R]. 2004.
  • 7H1265[5M482003MB—A0]CMD.推进轴系校中计算书[R].2013.
  • 8H1127[5M482003MB—A1]HHI.推进轴系校中计算书[R].2013.

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部