摘要
平定县昌盛煤业有限公司设计取水量6.0万m^(3)/a,在分析其区域水资源条件的基础上,重点分析了项目取用阳胜河地表水可行性。
The designed water intake of Pingding Changsheng Coal Industry Co.,Ltd. is 60 000 m~3/a. Based on the analysis of its regional water resource conditions,the feasibility of using surface water from Yangsheng River for the project is emphatically analyzed.
出处
《山西水利科技》
2022年第4期52-54,共3页
Shanxi Hydrotechnics
关键词
取水水源
可行性分析
来水量计算
water source
feasibility analysis
calculation of water inflow