摘要 清管测径是新铺海底管道投产前的重要环节,也是在役海管完整性管理的重要步骤。清管通球后,通过观察清管器上测径板是否完好判断海管的内部情况。在实际施工过程中,因影响因素较多,清管测径时测径板会出现变形,导致无法准确判断出海管的实际状态。采用风险评价法结合项目施工经验,对造成海管清管测径板变形的因素进行分析,并从人员、设备、材料、工艺、环境等5个方面提出相关应对措施。 Pigging and diameter measurement was an important link before the new submarine pipeline is put into production, and it was also an important step for the integrity management of the in-service submarine pipeline. After pigging and pigging, the internal condition of the submarine pipeline was judged by observing whether the caliper plate on the pig is intact. In the actual construction process, due to many influencing factors, the diameter measuring plate would be deformed during pigging and diameter measurement, resulting in the inability to accurately judge the actual state of the submarine pipeline. The risk assessment method was adopted in combination with the project construction experience to analyze the factors that cause the deformation of the pigging caliper plate of subsea pipeline, and relevant countermeasures were proposed from five aspects, including personnel, equipment,materials, technology and environment.
作者 李友行 郑松贤 李斌 柳斌 兰学杰 LI Youhang;ZHENG Songxian;LI Bin;LIU Bin;LAN Xuejie
出处 《化工装备技术》 CAS 2022年第6期66-69,共4页 Chemical Equipment Technology
关键词 海管 清管测径 测径板 变形 风险 Submarine pipeline Pig diameter measurement Caliper plate Deformation Risk
  • 相关文献

参考文献5

二级参考文献45

  • 1SY/T6383-99,长输天然气管道清管作业规程[S].
  • 2GB 50369-2006,油气长输管道工程施工及验收规范[S].
  • 3O’Donoghue A. Why pigs get stuck and how to avoidit[C]. Pipeline Pigging, Integrity Assessment, and RepairConference, Amsterdam, PAYS-BAS ?30/10/200)2003,48(2): 5-16.
  • 4Tiratsoo J N H. Pipeline pigging technology[M]. 2nd Edi-tion. Houston: Gulf Professional Publishing, 1992.
  • 5Cordell J,Vanzant H. The pipeline pigging handbook[M].Third Edition. Houston: Clarion Technical Publishers,2003.
  • 6Tolmasquim S T,Nieckele A O. Design and control of pigoperations through pipelinesfJ]. Journal of Petroleum Sci-ence and Engineering, 2008, 62(3-4) : 102-110.
  • 7Esmaeilzadeh F,Mowla D, Asemani M,et al. Modelingof pig operations in natural gas and liquid pipeline[C]. SPE102049,2006.
  • 8Azevedo L F A,Braga A M B, Nieckele A O,et al. Simplehydrodynamic models for the prediction of pig motions inpipelinestC]. SPE 8232, 1996.
  • 9Botros K K, Golshan H. Field validation of a dynamicmodel for an mflili tool in gas pipelines[C]. Calgary,Alberta, Canada: The 8th International Pipeline Confer-ence, 2010.
  • 10Nguyen T T,Kim S B,Hui R Y, et al. Modeling andsimulation for pig with bypass flow control in natural gaspipeline[J]. Journal of Mechanical Science and Technolo-gy, 2001, 15(9):1302-1310.

共引文献19

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部