摘要
2021年特大洪水后,该水库溢洪道下游冲刷严重,上游主河槽覆盖层冲毁,下游主河槽严重淤积,过流能力受到严重影响。溢洪道灾后水毁工程设计按照“原标准、原规模、原功能”的原则进行修复和加固处理,尽量挖填平衡,不增加永久用地,岸坡防护,岩石渠底整治,建筑物进行适当防护等。设计内容包括溢洪道尾水渠过流计算、平面布置、纵横断面、堤防工程及防护工程设计等。
After the catastrophic flood in 2021, the downstream spillway of the reservoir was seriously scoured, and the overburden of the upstream main channel was destroyed. The downstream main channel was seriously silted. The flow capacity was seriously affected.The design of the flood damaged spillway project is repaired and reinforced in accordance with the principles of original standard,original scale and original function, The design is tried to balance the excavation and filling, keep the number of permanent land and appropriately protect the bank slope, rock canal bottom and buildings. The design content includes overflow calculation, plane layout,vertical and horizontal sections, dike works and protection works design of spillway tailrace.
作者
李琦
LI Qi(Zhumadian Boshan Reservoir Authority,Zhumadian 463000,China)
出处
《河南水利与南水北调》
2022年第12期61-62,共2页
Henan Water Resources & South-to-North Water Diversion
关键词
水库
溢洪道
灾后水毁
设计分析
reservoir
spillway
flood damage after disaster
design analysis