期刊文献+

碾盘山水电站厂用电系统设计 被引量:3

Design of auxiliary power system for Nianpanshan Hydropower Station
下载PDF
导出
摘要 为提高碾盘山水电站的厂用电供电系统可靠性,针对枢纽工程贯流机组自用电负荷大,供电可靠性要求高等特点,分析厂用电系统设计原则,计算厂用电最大负荷,总结出碾盘山水电站厂用电系统接线与运行方式:以10 kV和0.4 kV两级电压供电,采用机组自用电和全厂公用电混合的供电形式,厂用电母线采用0.4 kV分段环形接线,母线之间基于PLC实现备自投功能。实践证明,碾盘山电站的厂用电系统设计合理可行并安全可靠。 In order to improve the reliability of auxiliary power supply system of Nianpanshan Hydropower station,the design principle of auxiliary power system was analyzed and the maximum load of auxiliary power was calculated according to the characteristics of large self-power load and high demand for power supply reliability of tubular units in key project,the connection and operation mode of auxiliary power system of Nianpanshan Hydropower Station was summarized,which is supplied with 10kV and 0.4 kV voltage,and the power supply mode was mixed with the self-use power of the unit and the public power of the whole power plant,the auxiliary power bus adopts 0.4 kV segment ring connection,and the auxiliary automatic switch function was realized between the buses based on PLC.The practice proved that the auxiliary power system design of Nianpanshan Hydropower Station was reasonable,feasible,safe and reliable.
作者 刘伟 黄戡 陶锋 LIU Wei;HUANG Kan;TAO Feng(Hubei Institute of Water Resources Survey and Design,Wuhan 430070,China;Water Resources Allocation Engineering Construction and Management Bureau of Northern Hubei Province,Wuhan 430062,China)
出处 《水利水电快报》 2023年第3期63-65,71,共4页 Express Water Resources & Hydropower Information
关键词 厂用电系统 供电可靠性 分段环形接线 PLC 备自投功能 碾盘山水电站 auxiliary power system power supply reliability segment ring connection PLC automatic switch function Nianpanshan Hydropower Station
  • 相关文献

参考文献6

二级参考文献16

共引文献9

同被引文献24

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部