湿地公园设计阶段造价控制研究 被引量:2

A Study on Cost Control of Wetland Park in Design Phase
下载PDF
导出
摘要 通过对湿地公园设计特征、湿地公园设计阶段造价存在问题的研究,提出采用价值工程的方法控制湿地公园造价。研究了如何更好地控制湿地公园方案决策阶段造价控制。该方法克服了传统造价控制方法的缺陷,又弥补了湿地公园设计阶段一些缺点和不足,在满足湿地公园功能需求的基础上使造价控制更为科学合理。 Based on the research on the design characteristics of wetland park and the problems existing in the cost of wedand park design stage,the method of value engineering to control the cost of wetland park was proposed.How to better control the cost control in the decision-making stage of wetland park scheme was studied.This method overcomes the defects of traditional cost control methods,and makes up for some shortcomings and deficiencies in the design stage of wetland park.On the basis of meeting the functional requirements of wetland park,the cost control is more scientific and reasonable.
作者 刘昕妍 LIU Xin-yan(Industry Development and Planning Institute,National Forestry and Grassland Administration,Beijing 100010,P.R.China)
出处 《森林防火》 2022年第2期132-134,共3页 JOURNAL OF WILDLAND FIRE SCIENCE
基金 国家林业和草原局业务委托项目(2018-GJLYJ-CBL)。
关键词 湿地公园 设计 造价控制 价值工程 研究 Wedand park Design Cost control Value engineering Research
  • 相关文献

参考文献8

二级参考文献53

共引文献35

同被引文献24

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部