摘要
随着对海洋能源的深入开发,新建的一些无人驻守井口平台井产物须流入已建平台,导致已建平台设备处理量增加,有的甚至达到段塞流捕集器处理极限能力。针对该问题,文章以渤中34-9油田CEPA平台段塞流捕集器改造为例,提供一种解决方法。该方法既节省项目投入的成本,又减少海上施工的工作量,而且能够满足增产的需要。
With the in-depth development of marine energy, the products of some newly built unmanned wellhead platform wells must flow into the built platform, resulting in the increase of the processing capacity of the built platform equipment, and some even reach the limit capacity of the slug flow catcher. In view of this problem, the article takes the transformation of the CEPA platform slug flow catcher in Bozhong 34-9 oilfield as an example to provide a solution. This method not only saves the cost of project investment, but also reduces the workload of offshore construction, and can meet the needs of increasing production.
作者
高金辉
GAO Jin-hui(CNOOC Energy Development Equipment Technology Co.,Ltd.Facilities Optimization and Upgrading Technology Service Center,Tianjin 300450,China)
出处
《化工管理》
2023年第9期140-142,共3页
Chemical Engineering Management
关键词
段塞流捕集器
处理量
丝网除沫器
改造方案
segment plug flow trap
processing capacity
screen foam remover
transformation scheme