期刊文献+

隧道机械化施工装备配套及选型方案 被引量:2

Matching of Tunnel Mechanized Construction Equipment and Selection Scheme
下载PDF
导出
摘要 介绍了隧道工程的主要施工方法,分析了隧道工程机械化施工存在的主要问题及解决策略,针对隧道机械化施工装备配套及选型方案进行研究,同时,提出加强组织管理,尽可能减少人为因素产生的干扰,实现隧道机械化施工的预期效果。 This paper introduces the main construction methods of tunnel engineering,analyzes the main problems and solutions of mechanization construction of tunnel engineering,and studies the matching and selection scheme of mechanization construction equipment of tunnel.At the same time,it proposes to strengthen the organization and management,as far as possible to reduce the interference caused by human factors,so as to achieve the expected effect of mechanization construction of tunnel.
作者 齐庆锋 QI Qing-feng(China Railway 18th Bureau Group Tunnel Engineering Co.Ltd.,Chongqing 401121,China)
出处 《工程建设与设计》 2023年第4期112-114,共3页 Construction & Design for Engineering
关键词 隧道工程 机械化施工 装备配套 设备选型 方案设计 tunnel engineering mechanized construction equipment matching equipment selection scheme design
  • 相关文献

参考文献2

二级参考文献21

共引文献34

同被引文献5

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部