摘要
以具体某超高层建筑工程为例,对工程进行了简要介绍,并对工程具体情况以及实际要求进行了分析。从幕墙工程出发,提出针对性定位测量提升策略,并对转接件、面板安装精度提升策略进行研究,从而加强精度控制,有效确保工程顺利竣工,优化最终的幕墙施工效果。
This paper takes a specific super high-rise building project as an example,gives a brief introduction to the project,and analyzes the specific situation of the project and the actual requirements.Starting from the curtain wall project,it puts forward the targeted positioning measurement improvement strategy,and studies the installation accuracy improvement strategy of the adapter and panel,so as to strengthen the precision control,effectively ensure the smooth completion of the project,and optimize the final curtain wall construction effect.
作者
王振荣
WANG Zhen-rong(Guangdong Zhongming Building Decoration Industry Co.Ltd.,Zhongshan 528400,China)
出处
《工程建设与设计》
2023年第4期190-192,共3页
Construction & Design for Engineering
关键词
超高层建筑
幕墙施工
施工测量
安装精度
super high-rise building
curtain wall construction
construction survey
installation accuracy