期刊文献+

零空闲置换流水车间总延误最小迭代贪婪算法

Iterative Greedy Algorithm for Minimizing Total Tardiness in No-Idle Permutation Flow Shop
下载PDF
导出
摘要 研究以总延误时间为目标且具有释放时间约束的零空闲置换流水车间调度问题。基于贪婪选择和作业对交换,设计基本迭代贪婪算法IGA;结合先到先服务FCFS排产规则对初始解的构建进行改进,并提出作业对多次循环交换对邻域搜索进行优化,递进设计了3种迭代贪婪算法FIGA、MIGA、FMIGA。通过不同规模的数据实验和与对比算法的比较分析,验证了FMIGA算法的有效性。结果显示该算法不仅能提高解的质量,而且具有良好的稳定性,为求解具有释放时间的零空闲置换流水车间总延误问题提出了一种新方法。 In this paper,the no-idle permutation flow shop scheduling problem with total tardiness time as objective and release time constraint is studied.A basic iterative greedy algorithm IGA is designed based on greedy selection and job pair exchange;the construction of the initial solution was improved by combining the first-come-first-served FCFS scheduling rules,and the optimization of the neighborhood search was proposed for multiple cyclic switching,and three iterative greedy algorithms FIGA,MIGA and FMIGA were designed progressively.The effectiveness of FMIGA algorithm is verified by different scales of data experiments and comparison analysis with the comparison algorithm.The results show that the algorithm can not only improve the quality of the solution,but also has good stability.A new method is proposed for solving the total tardiness problem of no-idle permutation flow shop with release time.
作者 赵志明 王建华 朱康 ZHAO Zhi-ming;WANG Jian-hua;ZHU Kang(School of Management,Jiangsu University,Zhenjiang 212016,China)
出处 《组合机床与自动化加工技术》 北大核心 2023年第3期177-182,共6页 Modular Machine Tool & Automatic Manufacturing Technique
基金 国家自然科学基金项目(71802099)。
关键词 零空闲 迭代贪婪算法 总延误 释放时间 FCFS no-idle iterative greedy algorithm the total tardiness release time FCFS
  • 相关文献

参考文献2

二级参考文献16

共引文献63

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部