摘要
本项目运用BIM智慧医院管理平台完成勘察设计、招投标、施工、运维等全过程协同管理工作。通过前期策划、整合协同管理机制,运用BIM技术对应急医院进行全过程工程咨询管理。使用Dynamo参数化设计、装配式全装修技术、BIM正向一体化设计对传染病医院的复杂系统、污染流线进行深化设计、模拟分析、全过程监管。
The project uses BIM smart hospital management platform to complete the collaborative management of the whole-process of survey and design, bidding, construction, operation and maintenance. Through early planning and integration of collaborative management mechanism, BIM Technology is used to carry out the whole-process engineering consulting management of emergency hospitals. Dynamo parametric design, assembled full decoration technology and BIM forward integrated design are used to deepen the design, simulation analysis and the whole-process supervision of the complex system and pollution streamline of the infectious disease hospital.
作者
杨晓林
Yang Xiaolin(Chongqing Architectural Design Institute Co.,Ltd.,Chongqing 400015,China)
出处
《土木建筑工程信息技术》
2023年第1期83-88,共6页
Journal of Information Technology in Civil Engineering and Architecture
关键词
应急医院
全过程工程咨询
装配式全装修技术
智慧医院管理平台
Emergency Hospital
Whole Process Engineering Consultation
Assembled Full Decoration Technology
Smart Hospital Management Platform