浅埋富水地层特大断面矩形顶管隧道掘进参数分析 被引量:1

Analysis of Tunneling Parameters of a Shallow-Buried Super-Large Cross-Sectional Rectangular Pipe Jacking Tunnel
下载PDF
导出
摘要 为保障特大断面矩形顶管隧道在浅覆土、小净距下的安全高效掘进,依托世界上首个直径15 m级3车道矩形顶管隧道工程,对顶管多刀盘开挖系统、减摩注浆系统、三螺机出渣系统进行针对性优化设计。通过对顶管主要掘进参数及地层沉降监测结果进行统计分析,得到以下结论:1)本工程采用的减阻措施有效降低了管节受到的地层摩擦阻力,实际总推力为理论值的40%左右;2)刀盘直径和安装高度对刀盘转矩影响较大,多数刀盘转矩均值小于额定转矩的一半,说明刀盘额定转矩有较大的优化空间;3)顶管掘进过程中盾壳受到较大的地层挤压力,土舱内渣土压力也显著大于地层侧向土压力,停机后上述压力均有较大幅度降低;4)顶管掘进后地表横向沉降槽呈“盆”状,隧道两侧0.5倍开挖宽度内的地层沉降较大。 The rectangular pipe jacking tunnel under Nanhu avenue in Jiaxing,China,is the world′s first 15-m diameter and three-lane pipe jacking tunnel.Targeted designs are implemented on the multi-cutterhead excavation,antifriction slurry grouting,and triple screw conveyor mucking systems to ensure the safe and efficient excavation of super-large cross-section pipe jacking under shallow soil and small clear distance conditions.Furthermore,statistical analysis is conducted on the main tunneling parameters of the pipe jacking machine and ground settlement monitoring results.Some conclusions are drawn as follows:(1)The friction reduction measures adopted effectively reduce the ground friction resistance of the pipe joint,and the actual total thrust is approximately 40%of the theoretical value.(2)The cutterhead diameter and mounting height considerably affect the torque.The average torque is less than half of the rated torque,so it can be optimized.(3)In the pipe jacking process,the shield shell is subjected to large stratum extrusion pressure,the residual earth pressure in the soil chamber is significantly greater than the lateral earth pressure of the stratum,and they both reduce after shield shutdown.(4)After pipe jacking excavation,the transverse surface settlement groove shows a U shape,and the stratum settlement within 0.5 times the excavation width on both sides of the tunnel is large.
作者 王发民 孟庆军 张浩 刘常利 杨振兴 张兵 WANG Famin;MENG Qingjun;ZHANG Hao;LIU Changli;YANG Zhenxing;ZHANG Bing(State Key Laboratory of Shield Machine and Boring Technology,Zhengzhou 450001,Henan,China;China Railway Tunnel Group Co.,Ltd.,Guangzhou 511458,Guangdong,China;Nanning Rail Transit Co.,Ltd.,Nanning 530000,Guangxi,China;The First Engineering Co.,Ltd.of China Railway Tunnel Group,Chongqing 401123,China)
出处 《隧道建设(中英文)》 CSCD 北大核心 2023年第2期316-326,共11页 Tunnel Construction
关键词 特大断面矩形顶管隧道 多刀盘开挖系统 减摩注浆系统 三螺机出渣系统 掘进参数 推力 刀盘转矩 地层沉降 super-large rectangular cross-section pipe jacking tunnel multi-cutterhead excavation system antifriction slurry grouting system triple screw conveyor mucking system tunneling parameters jacking force cutterhead torque ground settlement
  • 相关文献

参考文献15

二级参考文献100

共引文献318

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部