摘要 针对南方某城市区间防淹门施工配合不到位导致的区间遗留问题进行探讨,分析了在既有线路运营期间土建结构与设备整改过程中的技术可行性,对组织管理协调性,工效效率性等方面进行分析,探讨出一套在运营期间多专业作业协作,协同配合的管理方案。 Aiming at the problems left over by the inadequate construction coordination of the anti-flooding gate in a southern city,the technical feasibility,organization and management coordination,and work efficiency during the rectification of the civil structure and equipment during the operation of the existing linewere analyzed.After analysis,a set ofmanagement plans formulti-professional cooperation and collaboration during operationwere discussed.
作者 刘和平 LIU He-ping(China Institute of Building Standard Design&Research,Beijing 100082,China)
出处 《工程建设与设计》 2023年第5期110-112,共3页 Construction & Design for Engineering
关键词 区间防护设备 协作 工程管理 管理模式 interval protective equipment collaboration engineeringmanagement managementmode
  • 相关文献

参考文献1

二级参考文献2

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部