土压平衡盾构长距离硬岩掘进螺旋输送机问题分析与对策研究

Fault Analysis and Countermeasures for Screw Conveyor of Earth Pressure Balance Shield Boring in Long-Distance Hard Rock Section
下载PDF
导出
摘要 为解决某盾构在长距离掘进、石英含量较高、硬岩地层时出现螺旋机卡机导致的滞排渣等问题,分析引起螺旋机故障的原因,提出螺旋机滞排后处理措施,制定并实施了修复方案,取得了良好的修复效果。针对盾构长距离掘进硬岩工况,提出液压系统优化改进方案、螺旋机卡机后操作工艺,并通过试验得出合适的掘进工艺参数以及膨润土配比方案。基于盾构长距离掘进硬岩工况的设备结构优化方法、设备操作方法、施工工艺方法,解决了现场螺旋机卡机问题,保障了现场设备的高效运行。 When an earth pressure balance shield tunneling in a long-distance section with high quartz content,the screw conveyor jammed and hysteretic mucking occurred.Hence,the causes for screw conveyor malfunction are analyzed,countermeasures are proposed for hysteretic mucking,and corresponding repairing methods are determined,resulting in a good effect.Furthermore,according to the hard rock conditions,an optimized scheme for hydraulic system and treatments for screw conveyor jamming are proposed,and the suitable driving technological parameters and rational bentonite ratio are obtained through test.The countermeasures recommended successfully release the screw conveyor and guarantee the high-efficient operation of the equipment onsite.
作者 李功义 LI Gongyi(China Railway 11th Bureau Group Corporation Limited,Wuhan 470013,Hubei,China)
出处 《隧道建设(中英文)》 CSCD 北大核心 2022年第S02期502-507,共6页 Tunnel Construction
关键词 盾构 硬岩地层 螺旋输送机 滞排渣 长距离掘进 shield machine hard rock formations screw conveyor hysteretic mucking long-distance boring
  • 相关文献

参考文献15

二级参考文献173

共引文献125

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部