摘要
乌兹别克AMU-BukharaⅡ(阿姆布哈拉-Ⅱ)泵站现代化改造项目为中核二二公司签订的EPC总承包项目,上电承接了其中10台电机及附属设备的现代化改造。因海外改造项目的现场施工条件差、各泵组接口复杂、客户要求高等因素,导致项目的技术执行难度较高。主要叙述了此项目电机改造的测绘要点和针对性结构设计。
Uzbek AMU-BukharaⅡ(Ambukhara Ⅱ) Pump Station modernization is an EPC general contract project signed by China Nuclear Industry 22nd Construction Co.,Ltd,and Shanghai Electric Machinery Factory undertakes the modernization for 10 sets of motor and ancillary equipment.Due to the poor site construction conditions of overseas reconstruction projects,the complex interface of each pump group and the high requirements of customers,the implementation of this project is quite difficult.This paper mainly describes the surveying and drawing points of this project motor transformation and the targeted structure design.
作者
祁腊梅
QI Lamei(Shanghai Electric Machinery Co.,Ltd.,Shanghai 200240,China)
出处
《上海大中型电机》
2023年第1期16-18,22,共4页
Shanghai Medium and Large Electrical Machines
关键词
水泵电机
现代化改造
测绘
设计
Pump motor
Modernization restructuring
Surveying and drawing
Design