摘要
根据《煤矿防治水细则》等规定,结合安居煤矿埋深大、构造条件复杂的实际情况,制定合理的封堵方案,对防水闸墙类型、工程设计参数进行设计、验算,确保技术方案合理,安全程度可靠。
s:According to the Detailed Rules for the Prevention and Control of Water in Coal Mines and in combination with the actual situation of Anju Coal Mine with large burial depth and complex structural conditions,a reasonable plugging scheme is formulated,and the type of waterproof gate wall and engineering design parameters are designed and checked to ensure that the technical scheme is reasonable and the safety degree is reliable.
作者
刘浩
王栋
王绪奎
张磊
LIU Hao;WANG dong;Wang Xukui;ZHANG Lei(Anju Coal Mine of Jining Mining Group Co.Ltd,Jining 272059,China;Jining Energy Comprehensive Law Enforcement Detachment,Jining 272005,China)
出处
《煤矿现代化》
2023年第2期58-63,共6页
Coal Mine Modernization
关键词
防水闸墙
设计
waterproof wall
design
practice