期刊文献+

新形势下山西焦煤集团实施精煤战略的思考 被引量:1

Shanxi Coking Coal Group's thoughts on the way to implement the clean coal strategy under the new situation
下载PDF
导出
摘要 针对选煤厂的洗选能力远低于矿井生产能力,且富余的矿井原煤或毛煤大多采用委托洗选方式进行洗选加工的现状,为提高洗选加工能力,按照山西焦煤集团精煤战略实施要求,结合实际提出“一厂三基地+井下矸石分选充填”建设模式,并对新形势下建设选煤厂进行了相关思考。分析表明,建设新的选煤厂作为稳定和提高企业经济效益的有效手段,是山西焦煤集团打造具有全球竞争力炼焦煤企业的必然选择和内在要求。 The present situation faced by Shanxi Coking Coal Group is that the treating capacities of the coking coal washing plants are far below that of the coal mines,and the raw coal or run-of-mine coal that is left untreated is washed and processed on a commission basis.In order to enhance the coal washing capacity,and meet the requirement for implementing the"clean coal strategy",the group opts for the coal preparation plant construction mode in line with the specific conditions,i.e.construction of a coal preparation plan with 3 bases and the capacity of making,underground stowing with waste rock.Some thoughts on such a plant construction mode under the new situation is presented in the paper.As shown by analysis results,construction of new types of plants proves to be an effective approach for stabilizing and improving economic benefits and also the coking coal group's inevitable choice and internal requirement in its effort to build a globally first-rate enterprise with world wide competitiveness.
作者 李霞 高建川 陈飚 邢春芳 LI Xia;GAO Jianchuan;CHEN Biao;XING Chunfang(Coal Preparation Plant of Lvlin Energy and Chemical Company,Shanxi Coking Coal Group,Lvliang 033200,China;Shanxi Coking Coal Energy Co.Ltd.,Taiyuan 030000,China)
出处 《选煤技术》 CAS 2022年第6期9-13,共5页 Coal Preparation Technology
关键词 选煤厂建设 一厂三基地 井下矸石分选充填 深度预排矸 选煤智能化建设 construction of coal washing plant one plant with 3 bases underground sorting of gangue and stowing intensive preremoval of waste rock construction of intelligent plant
  • 相关文献

参考文献10

二级参考文献30

共引文献29

同被引文献13

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部