江堤区河道综合整治项目作业多,施工范围广,为解决该项目点多面广、工序交叉作业和施工作业组织及安全问题,从现场管理的角度出发,分析项目施工组织的重难点,提出合理的施工工艺,编排项目施工关键线路,保证安全和质量的条件下对施工组织设计进行优化,确保项目高质量履约。
The comprehensive river regulation project in the embankment area has many operations and a wide construction range.In order to solve the problems of wide range of project points,cross-operation of procedures,organization and safety of construction work,this paper analyses the difficulties and difficulties of project construction organization from the point of view of site management.At the same time,reasonable construction technology is put forward,key line of project construction is arranged,construction organization design is optimized under conditions of safety and quality,and high-quality performance of project is guaranteed.
作者
司徒顺明
SITU Shun-ming(GuangdongZhongshanXiaolanWater Affairs Center,Zhongshan 528400,China)
出处
《云南水力发电》
2023年第3期197-201,共5页
Yunnan Water Power
关键词
河道整治
施工组织
现场管理
施工管理
river regulation
construction organization
site management
construction management