摘要 新建高速铁路接触网基础工程由站前施工单位预留,并与站前工程同步施工,但站前预留接触网基础工程施工中存在施工不规范情况。为进一步探讨接触网基础施工问题,以新建中兰铁路为例,总结路基和隧道区段接触网基础施工过程中出现的典型问题,提出相应整改方案及预防措施。研究成果对路基接触网基础和隧道内预埋槽道施工和问题整改具有一定指导意义。 OCS foundation works of new high speed railway is reserved by the construction contractor of civil works and constructed simultaneously with the civil works,where,however,its construction quality is often unacceptable.In order to further discuss the problems of OCS foundation construction,the paper summarizes the typical problems arising in OCS foundation construction in subgrade and tunnel sections,and proposes the corresponding treatment scheme and prevention measures,by taking the new Zhongwei-Lanzhou Railway as an example.The research results provide references for the construction and problem treatment of OCS foundation in subgrade and pre-laid ducts in tunnels.
作者 黄涛 HUANG Tao(CR Lanzhou Construction Quality Supervision Station,China Railway Lanzhou Group Co.,Ltd.,Lanzhou Gansu 730000,China)
出处 《铁路技术创新》 2022年第5期114-119,共6页 Railway Technical Innovation
关键词 高速铁路 接触网 基础施工 典型问题 整改方案 high speed railway OCS foundation construction typical problems treatment scheme
  • 相关文献

参考文献4

二级参考文献16

  • 1蒋鑫,邱延峻,魏永幸.斜坡软弱地基填方工程研究[J].铁道工程学报,2006,23(1):32-35. 被引量:3
  • 2史建明,吕振聚.大涌水地段的接触网基础施工[J].电气化铁道,2006(5):30-31. 被引量:3
  • 3JGJ79-2002.建筑地基处理技术规范[S].,2002..
  • 4TB10009-2005,铁路电力牵引供电设计规范[S].
  • 5JGJ 94-2008,建筑桩基技术规范[S].
  • 6GB50204-2011,混凝土结构工程施工质量验收规范[S].
  • 7GB50007-2011,建筑地基基础设计规范[S].
  • 8客货共线铁路电力牵引供电工程施工技术指南(TZ10208-2008)[S].
  • 9[德]Kiling,Puschman,Schmieder.电气化铁道接触网[M].北京:中国电力出版社,2003.
  • 10TB10005-2010混凝土结构耐久性设计规范[S].