龙峰煤业9号煤层水害分析与防治技术

Analysis and Prevention Measures of Water Disaster in No.9 Coal Roof of Longfeng Mine
下载PDF
导出
摘要 根据矿井水文地质条件和实际情况,分析9号煤层上覆3号煤采空区积水和K5、K6灰岩含水层富水性,设计疏放水钻孔,在9号煤层工作面顺槽布置钻场,钻孔窜层通过K_(5)、K_(6)灰岩,终孔探至3号煤层采空区,探测并疏放含水层及空区积水,有效消除了9号煤层顶板含水层和上覆3号煤层采空区积水对矿井安全生产的水害威胁。 According to the hydrogeological conditions and actual situation of the mine,the ponding in the overlying No.3 coal goaf of No.9 coal seam and the water abundance of K5 and K6 limestone aquifers are analyzed,and the drainage boreholes are designed.The drilling yard is arranged along the channel in the worKing face of No.9 coal seam.The drilling channeling passes through K5 and K6 limestone,and the final hole is explored to the goaf of No.3 coal seam to detect and drain the ponding in the aquifer and goaf.The No.9 coal seam roof aquifer and the ponding in the overlying No.3 coal seam goaf have effectively eliminated the threat of water damage to mine safety production.
作者 张宏伟 Zhang Hongwei(Shanxi CoKing Coal Group Huajin CoKing Coal Longfeng Coal Industry Co.,Ltd.,Fenyang Shanxi 032200)
出处 《现代工业经济和信息化》 2023年第2期264-265,267,共3页 Modern Industrial Economy and Informationization
关键词 含水层 采空区 水害分析 防治措施 aquifer goaf water damage analysis prevention and control measures
  • 相关文献

参考文献3

二级参考文献5

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部