鳊鱼洲长江大桥南汊航道桥塔梁同步施工测量技术 被引量:1

Measurement Techniques Used in Pylon and Girder Synchronous Construction of Bianyuzhou Changjiang River Bridge
下载PDF
导出
摘要 安九铁路鳊鱼洲长江大桥南汊航道桥为(50+50+224+672+174+50+50+50)m钢箱混合梁斜拉桥,主跨和辅助跨采用钢箱梁,桥塔采用H形塔,黄梅侧桥塔采用塔梁同步方案施工。针对塔梁同步施工测量重难点,运用莱卡TM50全站仪自动化实时采集塔端监测数据,利用Matlab程序计算塔柱纵向偏移量以修正塔偏;在塔柱“零状态”下采用天顶距法传递高程基准,采用精密全站仪后方交会设站传递平面基准至塔柱顶端测量平台,基于内控法进行钢锚箱安装及精密定位测量;采用全站仪三维坐标法进行钢箱梁安装定位,基于相对高差法控制钢箱梁安装线形。塔梁同步施工测量期间,通过加密控制网、全站仪自动观测、塔偏修正、钢锚箱精确定位及钢箱梁安装等技术,使塔柱和主梁施工节段能正确无误地顺接,在保证施工质量的同时缩短了施工工期。 The south branch navigation channel bridge of Bianyuzhou Changjiang River Bridge of the Anqing-Jiujiang Railway is a cable-stayed bridge with a main span of 672 m,two side spans of 224 m and 174 m,and five spans of 50 m.The superstructure consists of steel and concrete box girders,specifically streamlined steel box girders in the main span and auxiliary spans.The pylons are H-shaped structures,and the Huangmei-shore pylon was constructed in parallel with the girders.Considering the measurement focus and complexities in the pylon-girder synchronous construction,a Leica TM50 total station was used to carry out real-time monitoring of the pylon head.The pylon column longitudinal offset was calculated in Matlab software for modification.When the pylon columns were in"zero state",the zenith distance method was used to transmit the elevation datum,and a total station intersection method was used to transmit the plan datum to the pylon-top measurement platform,with the internal control method,the steel anchor boxes were installed and precise positioning measurement was performed.The steel box girder installation positioning was carried out by the total station 3D coordinate measurement.The steel box girder installation alignment was controlled based on the relative height difference method.To ensure the accurate sequential connection of the pylon and main girder segments,a series of techniques were used,including thickening the control network,using total station for automatic observation,pylon offset modification,accurate steel anchor box positioning and steel box girder installation.The construction schedule was shortened without compromising the required quality.
作者 夏焕文 常建增 XIA Huan-wen;CHANG Jian-zeng(The Fifth Engineering Co.,Ltd.,China Railway Major Bridge Engineering Group,Jiujiang 332001,China)
出处 《世界桥梁》 北大核心 2023年第S01期91-96,共6页 World Bridges
关键词 斜拉桥 塔梁同步施工 塔柱偏移 全站仪自动观测 内控法 相对高差法 测量技术 cable-stayed bridge pylon-girder synchronous construction pylon offset total station automatic observation internal control method relative height difference method measurement technique
  • 相关文献

参考文献15

二级参考文献78

  • 1孙全胜,孙永存.斜拉桥塔梁同步施工与控制技术的研究[J].公路,2007,52(4):88-91. 被引量:20
  • 2TB10415-2003/J286-2004,铁路桥涵工程施工质量验收标准[S].
  • 3交通部公路科学研究所.JTGF80/1-2004公路工程质量检验评定标准[S].北京:人民交通出版社,2004.
  • 4中国有色金属工业协会.GB50026-2007工程测量规范[S].北京:中国标准出版社,2007.
  • 5中华人民共和国铁道部.TB10101-2009铁路工程测量规范[S].北京:中国铁道出版社,2009.
  • 6中华人民共和国国家质量监督检验检疫总局,中国国家标准化管理委员会.GB/T18314-2009全球定位系统(GPS)测量规范[S].北京:中国标准出版社,2009.
  • 7国家质量技术监督局.GB12897-2006国家一、二等水准测量规范[S].北京:中国标准出版社,2006.
  • 8国家质量技术监督局.GB/T15314-94精密工程测量规范[S].北京:中国标准出版社,1994.
  • 9GB50026-93.工程测量规范[S].[S].,..
  • 10GB12898-91.国家三、四等水准测量规范[S].[S].国家测绘局,1991..

共引文献85

同被引文献9

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部