2Tang L X,Guan J,Hu G F.Steel making and refining coordinated scheduling problem with waiting ti me and transportation consideration. Computers and Industrial Engineering . 2010
3Atighehchian A,Bijari M,Tarkesh H.A novel hybrid algorithm for scheduling steel-making continuous casting production. Computers and Operations Research . 2009
4Tang L X,Luo J X.A newILS algorithmfor cast planning problemin steel industry. ISIJ International . 2007
5Bellabdaoui A,,Teghem J.A mixed-integer linear programming model for the continuous casting planning. International Journal of Production Economics . 2006
6Wang G S,Tang L X.A column generation for locomotive scheduling problemin molten iron transportation. IEEE International Conference on Automation and Logistics . 2007
7Tang L X,Wang GS,LiuJ Y.Abranch-and-price algorithm to solve the molten iron allocation problemin iron and steel industry. Computers and Operations Research . 2007
8Missbauer H,Hauber W,Stadler W.A scheduling system for the steelmaking- continuous casting process. A case study from the steel-making industry. In- ternational Journal of Production Research . 2009