期刊文献+

考虑工序复杂性和员工差异的成组产品并行生产线平衡优化 被引量:1

Balancing optimization of parallel production lines for group products considering process complexity and employee variance
下载PDF
导出
摘要 针对具有产品关联性的成组产品并行生产线平衡优化问题,采用分阶段研究思路,先后考虑工序复杂性与员工技能水平差异,提出工序与员工分配优化方案。首先以工序优先关系和设备属性为约束,以生产节拍、时间均衡指数和复杂性平滑系数为优化目标建立优化模型,将工序合理分配于工位中。然后根据成组产品特性和各工位技能需求建立员工指派模型,将不同技能员工与工位匹配,减少并行生产线之间节拍差异,实现成组产品的均衡生产。采用遗传算法和拟退火算法分别求解工序分配问题和员工指派问题,并结合实例验证了优化思路与方法的有效性。 Aiming at the balance optimization problem of group product parallel production line with product correlation,a phased research idea was adopted to propose an optimization scheme for process and employee assignment by successively considering process complexity and employee skill level differences.First,by taking the process precedence relation and equipment attributes as the constraints and the production cycle time,time balance index and complexity smoothing coefficient as the optimization objectives,the optimization model was established,so that the processes can be reasonably allocated to the workstations.Then,according to the characteristics of group products and the skill requirements of each workstation,the employee assignment model was established to match employees with different skills to workstations,so as to reduce the difference in the beat between parallel production lines and achieve balanced production of group products.Genetic algorithm and quasi�annealing algorithm were used to solve the process assignment problem and the employee assignment problem respectively,and the effectiveness of the optimization idea and method was verified with the example.
作者 楚岩枫 高晋钢 CHU Yanfeng;GAO Jingang(School of Economics and Management,Nanjing University of Aeronautics and Astronautics,Nanjing 211106,CHN)
出处 《制造技术与机床》 北大核心 2023年第4期132-140,共9页 Manufacturing Technology & Machine Tool
基金 中央高校基本科研业务费专项资金项目(56XAB21015)。
关键词 工序复杂性 员工技能水平 成组产品 并行生产线 线平衡 process complexity employee skill level group product parallel production line line balance
  • 相关文献

参考文献6

二级参考文献38

  • 1饶运清,EFSTATHIOU Janet.基于信息熵的制造系统复杂性测度及其在调度中的应用[J].机械工程学报,2006,42(7):8-13. 被引量:38
  • 2Eitzen Guy,Panton D.Multi-skilled workforce,optimization[J].Annals of Operations Research,2004,127:359-372.
  • 3De Korvin A,Shipley M F,Kleyle R.Utilizing fuzzy compatibility of skill sets for team selection in multi-phase projects[J].J Eng Technol Manage,2002,19:307-319.
  • 4Park P S.The Examination of Worker Cross-train ing in a Dual Resource Constrained Job Shop[J].European Journal of Operational Research,1991,51:291-299.
  • 5Isabel Correia,Francisco Saldanha-da-Gama.A note on"branch-and-price approach for the multiskill project scheduling problem"[J].Optimization Letters,2014(8):1721-1734.
  • 6Soumia Ichoua,Michel Gendreau,Jean-Yves Potvin.Diversion Issues in Real-Time Vehicle Dispatching[J].Transportation Science,2000,34(4):426-438.
  • 7PAN Hanchuan,SUN Yanshuo,XIAO Guanyu.Dynamic assignment of emergency passenger flows after metro accidents[C]//ICTE 2011?ASCE 2011:2952-2958.
  • 8Nam KC,Kwak Ks,Y u Ns.Simulation study of containerter minal performance.Journal of Waterway Port Coastal And Ocean Engineering-Asce,2002,128(3):126-132..
  • 9廖广瑞,刘振元,毕阳.多技能资源时间窗约束下项目调度研究[C]//26th Chinese Control and Decision Conference(CCDC).2014:4885-4891.
  • 10郑力,江平宇,乔立红,奚立峰.制造系统研究的挑战和前沿[J].机械工程学报,2010,46(21):124-136. 被引量:53

共引文献33

同被引文献13

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部