期刊文献+

基于绿色低碳的变电站工程集约化建设

Intensive construction of substation project based on green and low-carbon
下载PDF
导出
摘要 在“碳达峰、碳中和”“绿色可持续发展”战略目标背景下,深化绿色变电站工程建设、开展低碳集约化研究成为电网企业工程绿色发展的重要工作。文章致力于构建绿色、安全、环保、可持续的新型变电站,确立集约化建设思路,围绕遵循PDSA“绿色策划-绿色实施-绿色升级-绿色评价”的实施路径,系统化实践“引用地源热泵系统、实施逆向供应固废回收策略、雨水回收利用、打造光伏微网系统”等绿色施工建设举措,助力“双碳”目标实现,推动社会绿色发展。 In the context of the strategic objectives of"carbon peaking,carbon neutralization"and"green sustainable development",deepening the construction of green substation projects and carrying out low-carbon intensive research has become an important work for the green development of power grid enterprise projects.This paper is committed to building a new type of transformer substation that is green,safe,environmentally friendly and sustainable,establishing an intensive construction idea,and systematically practicing green construction measures such as"quoting ground source heat pump system,implementing reverse supply solid waste recycling strategy,rainwater recycling,and building a photovoltaic micro grid system"to help achieve the"dual carbon"goal by following the implementation path of PDSA"green planning-green implementation-green upgrading-green evaluation",promote social green development.
作者 陈亮 郑新建 彭程 CHEN Liang;ZHENG Xinjian;PENG Cheng(Lianyungang Power Supply Branch of State Grid Jiangsu Electric Power Co.,Ltd.,Lianyungang 222004,China)
出处 《中国高新科技》 2023年第3期96-98,共3页
关键词 碳达峰 碳中和 绿色变电站 工程建设 可持续 carbon peak carbon neutralization green substation engineering construction sustainable
  • 相关文献

参考文献3

二级参考文献27

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;