摘要
九九坑水库防洪调度运用方案主要采用设计暴雨推求设计洪水法和地区综合推算法,经研究采用推理公式法更为合理。方案主要内容包括对设计洪水进行复核,研究水库防洪调度运行方案以及超标准洪水的应对措施。文章研究九九坑水库防洪调度运用方案为更好指导九九坑水库调度运行,也为水行政主管部门审批提供可靠的技术依据。
The flood control operation scheme of Jiujiukeng Reservoir mainly adopts the design storm calculation method and the regional comprehensive calculation method,and the reasoning formula method is more reasonable after research.The main contents of the plan include the review of the design flood,the study of the reservoir flood control operation plan and the response measures for flood beyond the standard.This paper studies the flood control operation plan of Jiujiukeng Reservoir to better guide the operation of Jiujiukeng reservoir and provide reliable technical basis for the approval of the water administrative department.
作者
严志超
YAN Zhichao(Water Conservancy Bureau of Longhai District,Zhangzhou City,Fujian Province,Longhai 363100,China)
关键词
水库
大坝
运行调度
防洪
方案
reservoir
dam
operation scheduling
control flood
scheme