特高压混合多端直流系统故障退站后处置方法研究 被引量:3

Research on disposal methods of station disconnection caused by UHV hybrid multi-terminal HVDC system fault
下载PDF
导出
摘要 本文结合工程运维经验,以±800kV昆柳龙特高压混合多端直流工程为例,介绍多端直流系统运行接线方式,分析多端直流系统故障退站后进入不同运行方式的处置流程,并说明不同处置措施下的直流输送能力变化及负荷损失程度,以期为相关技术人员在多端直流工程现场运维过程中处置退站故障提供参考。 Based on the experience of engineering operation and maintenance,taking±800kV Kunliulong ultra high voltage(UHV)hybrid multi-terminal DC project as an example,this paper introduces the multi-terminal DC operation wiring mode,analyzes the multi-terminal DC fault and different operation modes after exiting the station.The change of DC transmission capacity and the degree of load loss under different disposal methods are described,which can provide preference for the disposal of outgoing faults in the on-site operation and maintenance of multi-terminal DC.
作者 龙磊 LONG Lei(Kunming Bureau of EHV Power Transmission Company,China Southern Power Grid Co.,Ltd,Kunming 650000)
出处 《电气技术》 2023年第3期44-51,共8页 Electrical Engineering
关键词 混合多端直流 运行接线方式 故障处置 现场运维 hybrid multi-terminal HVDC wiring mode fault treatment on-site operation and maintenance
  • 相关文献

参考文献15

二级参考文献182

共引文献301

同被引文献42

引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部