岳阳铁水集运煤炭储备项目接轨方案研究

Study on railway connection scheme of Yueyang rail-water intermodal transportation coal reserve project
下载PDF
导出
摘要 铁路接轨方案是铁路专用线前期方案研究的重点,以岳阳铁水集运煤炭储备铁路项目为例,介绍了接轨方案选择考虑的各方面因素,通过对各方案进行综合比选,最终选择经济合理、技术可行的相对最优方案,使该铁路工程达到技术可行、经济合理的目标。 The railway connection scheme is the focus of the preliminary scheme research of the railway dedicated line.Taking the Yueyang railway-water combined transportation coal reserve railway project as an example,this paper introduces various factors considered in the selection of the connection scheme,and finally selects the relatively optimal scheme that is economically reasonable and technically feasible through comprehensive comparison and selection of each scheme,so that the railway project can reach the goal of technically feasible and economically reasonable.
作者 李兵 Li Bing(China Railway Wuhan Survey and Design&Institute Co.,Ltd.,Wuhan 430074,China)
出处 《山西建筑》 2023年第8期140-144,共5页 Shanxi Architecture
基金 国家铁路局科技与法规司科研课题(KFJF2019-094)。
关键词 铁路 接轨方案 车站改造 railway connection scheme station reconstruction
  • 相关文献

参考文献5

二级参考文献23

  • 1李庆生.兰州枢纽规划设想[J].铁道标准设计,2006,26(z1):89-92. 被引量:2
  • 2苏碧成.哈大客运专线引入长春枢纽方案研究[J].铁道标准设计,2006,26(z1):114-118. 被引量:4
  • 3宁荣.申银特钢铁路专用线设计方案研究[J].铁道建筑技术,2013(S1):142-144. 被引量:2
  • 4铁道第四勘察设计院.铁路工程设计技术手册.站场及枢纽[M].北京:中国铁道出版社,2004.
  • 5崔石军,王秀飞.提高神木北站咽喉通过能力的建议[J].铁道运输与经济,2007,29(11):11-13. 被引量:2
  • 6铁道第四勘察设计院.铁路工程设计技术手册@站场及枢纽[M]北京:中国铁道出版社,2004.
  • 7中华人民共和国铁道部.新建时速200公里客货共线铁路设计暂行规定[S]北京:中国铁道出版社,2005.
  • 8中华人民共和国铁道部.铁路线路设计规范[S]北京:中国计划出版社,2005.
  • 9中华人民共和国铁道部.铁路车站及枢纽设计规范[S]北京:中国计划出版社,2005.
  • 10中铁工程设计咨询集团有限公司.新建铁路荆州至岳阳线可行性研究报告[M]北京:中铁工程设计咨询集团有限公司,2009.

共引文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部