摘要
根据风塔生产的实际情况和工艺步骤,提出了风塔的具体制造方案,对其焊接检测、包装、运输等方面进行了分析,并对生产工艺中的关键问题和要求进行了探讨,以期为确保风塔生产的质量提供一定的依据。
According to the actual situation and process steps of wind tower production,the specifie manufacturing plan of wind tower is proposed,and its welding inspection,packaging and transportation are analyzed,and the key issues and requirements in the production process are discussed,in order to provide some basis for ensuring the quality of wind tower production.
作者
香东远
Xiang Dongyuan(Gansu Jiantou New Energy Technology Co.,Ltd,Wuwei Gansu 733000)
出处
《机械管理开发》
2023年第3期65-67,共3页
Mechanical Management and Development
关键词
风电塔筒
质量控制
法兰
wind turbine tower
quality control
flange