摘要
预制装配结构是以预制构件为主要组成部分,装配连接形成混凝土结构,作为新兴的绿色环保建筑结构,在许多城市建设过程有着广泛的应用。随着建筑行业的不断发展,应用科学技术提高产业生产能力,成为了行业发展的方向。采用新型技术对传统建筑工艺进行改造,优化建筑过程中的资源配置,提高工程质量和速度,减少施工周期,实现经济效益提升,为建筑行业在可持续性的发展新形势下摸索一条新的道路。结合某工程实例,对预制构件吊装施工进行了设计分析和实施步骤论述。从前期准备、起吊工装、安全吊装等几个角度出发,简要地剖析了钢结构起吊工装吊装施工技术的运用技术分析。在进行钢结构起吊装施工的时候,需要在工厂中进行分段制作桁架,然后将其分段运送到现场进行吊装。对于钢立柱的安放要求起钩,转动,移动三个运动依次进行,以确保整个立柱的稳定。
Prefabricated assembly structures are mainly composed of prefabricated components,which are assembled and connected to form concrete structures.As a new green and environmentally friendly building structure,they are widely used in many urban construction processes.With the continuous development of the construction industry,the application of science and technology to improve industrial production capacity has become the direction of industry development.Using new technologies to transform traditional building processes,optimize resource allocation during the construction process,improve project quality and speed,reduce construction cycles,and achieve economic benefits,exploring a new path for the construction industry in the new situation of sustainable development.Based on an engineering example,the design analysis and implementation steps of prefabricated component hoisting construction are discussed.From the perspectives of preliminary preparation,lifting tooling,and safety lifting,this paper briefly analyzes the application and technical analysis of steel structure lifting tooling lifting construction technology.During the lifting construction of steel structures,it is necessary to fabricate trusses in sections in the factory,and then transport them to the site for lifting.The placement of steel columns requires three movements,namely,lifting,rotating,and moving,so as to ensure the stability of the entire column.
作者
刘哈达
LIU Hada(Beijing Chengjian Yijian Development Co.,Ltd.,Beijing,100012,China)
出处
《智能城市应用》
2022年第8期53-56,共4页
Smart City Application
关键词
预制构件
住宅项目
吊装施工
prefabricated components
residential projects
hoisting construction