摘要 结合工程案例,探讨单管顶管穿越高速公路时最大地面沉降量计算式和3条天然气管道(简称管排)并行顶管穿越高速公路时最大地面沉降量计算式。管排顶管穿越时最大地面沉降量发生在中间管道顶管位置,两侧管道顶管对中间管道顶管位置的地面沉降量造成叠加。介绍顶管注浆加固方案。 Combined with an engineering case,the calculation formula of maximum ground settlement when a single pipe jacking crosses the expressway and the calculation formula of maximum ground settlement when three natural gas pipelines(referred to as the pipe row)are jacked in parallel to cross the expressway are discussed.The maximum ground settlement of pipe row pipe jacking crossing occurs at the pipe jacking position of the middle pipe,and pipe jacking at both sides of the pipe causes superposition of the ground settlement at the pipe jacking position of the middle pipe.The pipe jacking grouting reinforcement scheme is introduced.
作者 张美兰 何哲 张巍 闻浩然 ZHANG Meilan;HE Zhe;ZHANG Wei;WEN Haoran
出处 《煤气与热力》 2023年第4期V0018-V0020,共3页 Gas & Heat
关键词 天然气管道 单管顶管穿越 管排顶管穿越 地面沉降 注浆加固 natural gas pipeline single pipe jacking crossing pipe row pipe jacking crossing ground settlement grouting reinforcement
  • 相关文献

同被引文献2

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部