摘要
结合工程案例,探讨单管顶管穿越高速公路时最大地面沉降量计算式和3条天然气管道(简称管排)并行顶管穿越高速公路时最大地面沉降量计算式。管排顶管穿越时最大地面沉降量发生在中间管道顶管位置,两侧管道顶管对中间管道顶管位置的地面沉降量造成叠加。介绍顶管注浆加固方案。
Combined with an engineering case,the calculation formula of maximum ground settlement when a single pipe jacking crosses the expressway and the calculation formula of maximum ground settlement when three natural gas pipelines(referred to as the pipe row)are jacked in parallel to cross the expressway are discussed.The maximum ground settlement of pipe row pipe jacking crossing occurs at the pipe jacking position of the middle pipe,and pipe jacking at both sides of the pipe causes superposition of the ground settlement at the pipe jacking position of the middle pipe.The pipe jacking grouting reinforcement scheme is introduced.
作者
张美兰
何哲
张巍
闻浩然
ZHANG Meilan;HE Zhe;ZHANG Wei;WEN Haoran
出处
《煤气与热力》
2023年第4期V0018-V0020,共3页
Gas & Heat
关键词
天然气管道
单管顶管穿越
管排顶管穿越
地面沉降
注浆加固
natural gas pipeline
single pipe jacking crossing
pipe row pipe jacking crossing
ground settlement
grouting reinforcement