摘要
为降低建筑施工项目的管理成本,提出一种基于BSA-ELM的建筑项目施工成本预测模型。首先介绍ELM神经网络算法和BSA算法;其次利用BSA算法的优势对ELM模型进行优化,从而形成一种基于BSA-ELM的预测模型;最后对基于BSA-ELM建筑项目施工成本预测模型进行测试,将其与传统的预测模型进行对比。结果证明,BSA-ELM预测模型的性能更好,预测精度更高。
In order to reduce the management cost of construction projects and reduce the economic burden of enterprises,this study proposes a construction cost prediction model of construction projects based on BSA-ELM.Firstly,ELM neural network algorithm and BSA algorithm are introduced.Secondly,the ELM model is optimized by using the advantages of BSA algorithm,so as to form a prediction model based on BSA-ELM;Finally,the construction cost prediction model based on BSA-ELM is tested and compared with the traditional prediction model.The results show that the performance of BSA-ELM prediction model is better and the prediction accuracy is higher.
作者
洪玉娟
HONG Yu-juan(Finance and Economics Department of Economics,Heilongjiang University,150000,Harbin,Heilongjiang,China)
出处
《河北水利电力学院学报》
2023年第1期62-67,共6页
Journal of Hebei University Of Water Resources And Electric Engineering
基金
2021年度黑龙江省高等教育教学改革项目(SJGY2020210659)
黑龙江省教育科学“十四五”规划2022年重点课题(GJB1422541)。