某生产厂房施工方案及技术措施

Construction Scheme and Technical Measures of a Production Building
下载PDF
导出
摘要 某公司生产车间项目场地狭隘、工期紧张,在实施该项目时,笔者按照招标文件的具体要求和项目的具体情况进行详细规划。文章以该项目为例阐述厂房建设施工中的施工工艺、新材料、新设备,指出应发挥公司现有的整体建设实力,加大人力、物力、财力投入,以确保工程质量、快捷、安全、文明地完成。 The production workshop project of a company has a narrow site and a tight schedule.To implement the project,the author carried out detailed planning according to the specific requirements of the bidding documents and specific conditions of the project.Based on the project,this paper expounds the construction technology,new materials and new equipment in the construction of the factory building,and points out that the company should give full play to its existing overall construction strength and increase the investment of human,material and financial resources to ensure the project quality,fast,safe and civilized completed.
作者 柳晓恩 LIU Xiao’en(Gansu Construction Supervision Co.,Ltd.,Lanzhou 730000,China)
出处 《有色金属设计》 2023年第1期65-68,共4页 Nonferrous Metals Design
关键词 生产厂房 厂房施工方案 施工技术 措施 Production building Plant construction scheme Construction technology Measures
  • 相关文献

参考文献5

二级参考文献29

共引文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部