摘要
近年来,国家力推PPP模式进行公路工程建设,对于参与PPP模式的建筑施工企业而言,较传统的单纯施工承包风险大幅提高,需施工企业从项目建设的全寿命周期考虑,站在投融建营一体化角度,严格把控各阶段的风险,加强风险管理,方可保证施工企业预期收益。结合南宁新扶一级公路PPP项目实施过程中遇到的实际问题和风险,对公路PPP项目风险管理点进行提炼总结,供相关人士参考借鉴。
In recent years,the national level pushing the PPP model for highway engineering construction,for construction enterprises to participate in the PPP mode,the traditional simple construction contracting sharply higher risk,to construction enterprises from the project of the construction of the whole life cycle,stood on the pitch melt building integration Angle,strictly control the risk of each stage,strengthen risk management,The expected revenue of the construction enterprise can be guaranteed.Based on the practical problems and risks encountered in the implementation process of Nanning Xinfu first-level highway PPP project,this paper summarizes the risk management points of highway PPP project for reference by relevant people.
作者
毛帅
李宝兰
MAO Shuai;LI Bao-lan(China Gezhouba Group Corporation No.1 Engineering Co.,Ltd.,Yichang,Hubei 443002,China)
出处
《黑龙江交通科技》
2023年第4期136-138,共3页
Communications Science and Technology Heilongjiang
关键词
PPP模式
公路工程
风险管理
思考
highway engineering PPP mode
risk management
thoughts