摘要 依托沈阳地铁3号线某暗挖区间下穿文化路立交桥工程,在工期、造价及对周边环境影响等角度对比分析明挖法进行桩基托换与暗挖法进行桩基托换方案的优缺点;从不影响地面交通角度出发,选择暗挖法进行截桩及桩基托换,通过风险分析确定暗挖风险处理措施,保证暗挖施工的安全性,并结合现场实施条件明确了桩基托换施工工序;最后,建立三维有限元模型,计算分析暗挖法桩基托换施工,计算结果表明:暗挖截桩方案施工引起的连续梁绝对沉降、差异沉降、倾斜及水平位移均小于桥梁变形预警值。 Based on the undercut section of Shenyang metro Line 3,the advantages and disadvantages of underpinning schemes of open-cut pile foundation and undercut pile foundation are compared and analyzed in terms of time limit,cost and environmental impact;From the point of view of not affecting ground traffic,the method of undermining is selected to cut piles and underpin piles.Risk treatment measures are determined through risk analysis to ensure the safety of undermining construction.The construction procedure of underpinning piles is defined in combination with the conditions of field implementation;Finally,a three-dimensional finite element model is established to calculate and analyze the underpinning construction of underground excavation pile foundation.The calculation results show that the absolute settlement,differential settlement,inclination and horizontal displacement of continuous beam caused by the construction of concealed excavation and pile cutting scheme are less than the early warning value of bridge deformation.
作者 赵东 ZHAO Dong(China Railway Major Bridge Reconnaissance&Design Institute Co.,Ltd.,Wuhan,Hubei 430050,China)
出处 《黑龙江交通科技》 2023年第4期148-150,共3页 Communications Science and Technology Heilongjiang
关键词 地铁暗挖区间 下穿 市政桥梁 桩基托换 underground excavation section of metro underneath municipal bridge pile underpinning
  • 相关文献

参考文献3

二级参考文献14

  • 1吴波,刘维宁,索晓明,史玉新.地铁施工近邻桥基加固效果三维数值分析[J].铁道工程学报,2005,22(5):48-52. 被引量:24
  • 2戴旗原,戴宝英.桩基托换安全技术[J].建筑安全,2006,21(1):55-56. 被引量:10
  • 3杨晓杰,邓飞皇,聂雯,李桂刚.地铁隧道近距穿越施工对桩基承载力的影响研究[J].岩石力学与工程学报,2006,25(6):1290-1295. 被引量:102
  • 4IWASAKI Y, WATANABE H, FUKUDA M, et al. Construction control for underpinning piles and their behavior during excavation[J]. Géotechnique, 1994, 44(4): 681-689.
  • 5YAMAGUCHI I, YAMAZAKI I, KIRITANI Y. Study of ground-tunnel interactions of four shield tunnels drive in close proximity, in relation to design and construction of parallel tunnels[J]. Tunnelling and Underground Space Technology, 1998, 13(3): 289-304.
  • 6SHARMA J S, HEFNY A M, ZHAO J, et al. Effect of large excavation on deformation of adjacent MRT tunnels[J]. Tunnelling and Underground Space Technology, 2001(16): 93-98.
  • 7TAKAHASHI K, FUKAZAWA N, AGIWARA T, et al. Observational control of slurry shield tunnels with super close spacing under the nearby bridge abutments loads[J]. Tunnelling and Underground Space Technology, 2004(19): 390.
  • 8TB 10003-2005.铁路隧道设计规范[S],2005.
  • 9王梦恕.地下工程浅埋暗挖技术通论[M]安徽教育出版社,2005.
  • 10丁红军,王琪,蒋盼平.地铁盾构隧道桩基托换施工技术研究[J].隧道建设,2008,28(2):209-212. 被引量:49

共引文献110