架空渡槽的空心墩支撑施工技术探讨

Discussion on Construction Technology of Hollow Pier support of Overhead Aqueduct
下载PDF
导出
摘要 空心墩是一种常见的支撑,其具有自重小,承载力高的特点被广泛应用于各类工程实践中,如架空渡槽的支撑。采用翻模进行空心墩施工时,具有诸多的施工技术要点,本研究以某架空渡槽空心墩支撑施工为例,对空心墩采用翻模施工进行简要的技术探讨。 Hollow pier is a common support,which has the characteristics of small dead weight and high bearing capacity,and is widely used in various engineering practices,such as the support of overhead aqueduct.There are many technical points in the construction of hollow pier using turnover formwork.This research takes the support construction of hollow pier of an overhead aqueduct as an example,and briefly discusses the technology in the construction of hollow pier using turnover formwork.
作者 王若云 Wang Ruoyun(Gansu Water Resources and Hydropower Engineering Bureau Co.,Ltd.,Lanzhou,China)
出处 《科学技术创新》 2023年第8期124-127,共4页 Scientific and Technological Innovation
关键词 架空渡槽 空心墩 翻模 模板翻升 overhead aqueduct hollow pier formwork turnover formwork turnover
  • 相关文献

参考文献5

二级参考文献22

共引文献17

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部