Construction of LNG receiving terminals The scale of receiving terminals is expanding rapidly At the end of 1999,the state approved the Guangdong LNG Pilot Project,which opened the prelude to the construction of LNG receiving terminals.In 2006,China’s first LNG receiving terminal,namely Dapeng LNG Receiving Terminal in Shenzhen,Guangdong Province,was put into operation,marking the beginning of the use of overseas natural gas in China.Since then,LNG receiving terminals including Shanghai Wuhaogou,Fujian Putian and Shanghai Yangshangang have been put into operation successively.During the“11th Five-year Plan”period,four LNG receiving terminals were built and put into operation,with a total receiving capacity of 9.8 million tons/year.Construction entered its peak period during the“12th Five-year Plan”period.Ten LNG receiving terminals including Liaoning Dalian,Jiangsu Rudong.