本文结合准朔铁路黄河特大桥的施工,介绍了大型缆索起重机安装工作索的意义,详细讲述了工作索起重系统的承重索、起重索、牵引索的安全检算,得出了各项结果符合要求的结论,并提出今后安装类似工作索起重系统的可优化之处。
This article introduces the significance of installing work cables for large cable cranes in conjunction with the construction of the Zhunshuo Railway Yellow River Extra Large Bridge.It elaborates on the safety inspection of the load-bearing,lifting,and traction cables of the work cable lifting system,and draws conclusions that all results meet the requirements.It also proposes areas for optimization in the future installation of similar work cable lifting systems.
作者
姚予东
YAO Yu-dong(Taiyuan Railway Construction Co.,Ltd.of China Railway Sixth Bureau,Taiyuan 030013,China)
出处
《价值工程》
2023年第11期121-123,共3页
Value Engineering
关键词
黄河特大桥
工作索吊
检算
Yellow River Grand Bridge
work rope crane
checking calculation