期刊文献+

建筑造价预结算审核方法与优化措施分析 被引量:2

Analysis on Construction Cost Pre-settlement Audit Methods and Optimization Measures
下载PDF
导出
摘要 在建筑工程造价中,预结算审核有助于建筑工程造价控制的进一步加强,第一时间找出建筑工程造价中存在的问题并解决,提高建筑工程造价控制水平,进而保证建筑工程质量。对此,文章在介绍建筑造价预结算审核的内容的基础上,分析建筑造价预结算审核方法,涉及全面审核法、重点审核法、分组计划审核法等方法,并针对建筑造价预结算审核的优化措施进行了深入分析,提出要深入调查分析建筑工程项目实际情况,重视审核材料和工程费用计取,对现有预结算方式加以创新等,以供参考和借鉴。 In the construction project cost, the pre-settlement audit helps to further strengthen the construction project cost control, find out the problems existing in the construction project cost and solve them at the first time, improve the construction project cost control level, and then ensure the construction project quality. In this regard, on the basis of introducing the content of construction cost presettlement audit, this paper analyzes the construction cost pre-settlement audit method, involving comprehensive audit method, key audit method, group plan audit method and other methods, and conducts in-depth analysis on the optimization measures of construction cost pre-settlement audit. It is proposed to investigate and analyze the actual situation of the construction project in depth, attach importance to audit materials and project cost calculation,and innovate the existing pre-settlement methods for reference.
作者 罗艺梅 LUO Yimei(China Railway Inter-city Planning and Construction Co.,Ltd.,Yinchuan 756000,Ningxia,China)
出处 《工程技术研究》 2023年第3期147-149,共3页 Engineering and Technological Research
关键词 建筑造价 预结算 审核方法 对比审核法 construction cost pre-settlement audit method comparative audit method
  • 相关文献

参考文献4

二级参考文献8

共引文献20

引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部