宽体钢箱梁施工中临时结构受力特性研究

Study on Stress Characteristics of Temporary Structure in Construction of Wide Steel Box Girder
下载PDF
导出
摘要 本文基于某超宽钢箱梁建设工程,建立了顶推施工临时结构的有限元模型,分析了临时结构在施工中拼装与滑移阶段最不利工况下的位移与应力情况,并对支架在各施工阶段进行了稳定性验算。结果表明,支架在拼装与滑移阶段的最不利工况下,支架的最大变形及最大应力均满足相关要求,超宽钢箱梁支架的稳定性均满足规范要求,但是滑道支架上的组合应力较大,施工需对其重点关注。 In this paper,based on the construction project of an ultra-wide steel box girder,the finite element model of the temporary structure in incremental launching construction is established.It analyzes the displacement and stress of the temporary structure under the most unfavorable working conditions in the assembly and sliding stages of construction,and checks the stability of the support in each construction stage.The results show that the maximum deformation and maximum stress of the support meet the relevant requirements under the most unfavorable working conditions during the assembly and sliding stages of the support,and the stability of the super wide steel box girder support meets the requirements of the specification,but the combined stress on the runway support is large,so the construction needs to focus on it.
作者 周俊强 李旭东 刘光辉 ZHOU Junqiang;LI Xudong;LIU Guanghui(China Railway 24th Bureau Group Co.,Ltd.,Shanghai,200000 China;Nanjing Shangtie Local Railway Development Co.Ltd.,Nanjing,Jiangsu Province,210000 China)
出处 《科技创新导报》 2022年第30期187-190,共4页 Science and Technology Innovation Herald
关键词 钢箱梁 顶推施工 有限元分析 稳定性分析 Steel box girder Incremental launching construction Finite element analysis Stability analysis
  • 相关文献

参考文献6

二级参考文献42

共引文献40

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部