结合印尼雅加达至万隆高速铁路工程的实际建设情况,分析了20 k V配电所的设计方案,并提出了20 kV电力系统施工建设集成优化技术,深入剖析了本次工程建设中施工技术的使用注意事项,包括配电所电缆沟布局、配电所调压器室母线安装、配电所电缆支架安装、配电所电缆敷设施工、配电所电缆阻燃防火措施等。
Combined with the actual construction of Jakarta to Bandung high-speed railway project in Indonesia,this paper analyzes the design scheme of 20 kV power distribution station,and puts forward the integrated optimization technology of 20 kV power system construction,and deeply analyzes the matters for attention in the use of construction technology in this project construction.It includes distribution office cable trench layout,distribution office voltage regulator room bus installation,distribution office cable bracket installation,distribution office cable laying construction,distribution office cable fire prevention measures,etc.
作者
孙吉
孔祥杰
张俊强
SUN Ji;KONG Xiang-jie;ZHANG Jun-qiang(China Railway Electric Bureau Group Co.Ltd.,Beijing 100000,China)
出处
《工程建设与设计》
2023年第7期153-155,共3页
Construction & Design for Engineering
关键词
高速铁路
20
kV电力系统
施工技术
high-speed railway
20 kV power system
construction technology