期刊文献+

通信线路干线迁移的主要方法解析

Analysis of the Main Methods of Communication Line Trunk Migration
下载PDF
导出
摘要 随着社会的快速发展,一些已有的通信线路与城市转型整体规划之间的矛盾愈发凸显,部分通信线路出现了搬迁的现象以及需要重新定位。基于此背景,当下需要重新铺装和整改结构的线路愈来愈多,在其规划和更新改造的环节中,就会产生与排水干线、供电系统、气路等干线交叠和其他各类繁杂的线路难题。文中从通信线路的概念出发,论述了通信线路干线的作用,探讨了通信线路干线挪动的措施,并提出了有效防范施工风险的策略。 With the rapid development of the society,the contradiction between some existing communication lines and the overall planning of urban transformation is becoming more and more prominent,which leads to the relocation and re-positioning needs of some communication lines.Based on this background,at present,more and more lines need to be resurped and rectify the structure,in the process of planning and reconstruction,there will be overlapping with drainage lines,power supply systems and gas roads and other complicated line problems.Starting from the concept of communica-tion line,this paper discusses the role of com munication line trunk line,discusses the measures of communication line trunk line movement,and how to effectively prevent theconstruction risks during the project implementation process.
作者 罗燕菊 LUO Yanju(Anbui Telecom Planning and Design Co.,Ltd.,Hefei 230031,China)
出处 《移动信息》 2023年第4期222-224,共3页 MOBILE INFORMATION
关键词 通信线路 干线施工方案 结构方案 Communication line Trunk line construction scheme Structure scheme
  • 相关文献

参考文献2

二级参考文献5

共引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部